Zenox successfully delivered one of its toughest projects for an oil & gas client, completing the engineering, documentation, fabrication, and handover of a membrane nitrogen system integrated with an instrument air package—as a sub-contractor.
✔️ All pressure vessels designed as per AS 1210
✔️ Instrumentation and electrical wiring executed to AS 3000
✔️ Skid structurally validated using FEA for dynamic loads up to 3G
The workmanship speaks for itself in the video. Whether operating as a sub-contractor or a main supplier, Zenox applies the same uncompromising standards of engineering integrity, safety, and quality.
This is how critical systems are built—for demanding oil & gas environments.